The project was completed to a tight 12 week programme and included structural work to open the kitchen into the living / dining space, widening access into the reception room and re-configuring access to the master bedroom whilst also building a walk in dressing area to the master suite. The property had a full re-wire, heating system alterations and upgrades, re-plastered to most areas and two bathrooms fitted out.

The kitchen was a bespoke design and build with floor to ceiling high gloss doors and solid wood ebony tops, Lightwave RF lighting controlled via traditional wall switch or via apple devices for scene setting, UFH to bathroom.

SP Services: Sourcing of property for investment below market value, arranging all pre-construction matters, SP acted as Main Contractor (Federation of Master Builder accredited), SP are managing the tenanted property.