The project involved stripping the property back to brick, removing the roof, a basement excavation to form a utility room, TV room with AV hub. Extensive structural works throughout and new full width rear extension, ground floor opened up to provide reception, open plan kitchen dining room. First floor re built to provide master bedroom, dressing and en-suite and guest room with en-suite, new floor addition to provide two further bedrooms and bathroom.

Overview of amenities: Plain English kitchen, Magnet utility room, stone tops by specialist suppliers, engineered Oak board flooring throughout with Parquet to ground floor, wet under floor heating to basement and ground floor, sprinkler system to ground floor, BOSS booster box pump to increase mains water pressure. Bespoke joinery throughout by specialist sub contractor, security by Banham, BPT entryphone.